COMRADES,
THE CIRCLE SECRETARY AND ASSISTANT CIRCLE SECRETARY COM.V.RAVICHANDRAN WILL BE ATTENDING THE BI-MONTHLY MEETING WITH PMG-CCR ON 08-01-2010. THE SUBJECTS FOR DISCUSSION ARE APPENDED.
R.ARAVINDHAN
CIRCLE SECRETARY
ANNEXURE
PENDING SUBJECT
PENDING SUBJECT
1. Inordinate Delay in issuing ACP orders to Group D staff
NEW SUBJECTS
NEW SUBJECTS
1. RESTORATION OF TCA POST
Consequent on transfer of the official the TCA post is kept vacant and additional burden of work to the existing staff. The TCA post is to be restored for normal functioning and to avoid accumulation of work.
2. ISTALATION OF REVERSE OSMOSIS (RO) WATER PURIFIER SYSTEM
CCRO staff are provided with can-water which should be of ISI standard. Pure drinking hot-water with an installation Reverse Osmosis System (ROS) in the Third Floor to cater to the needs of CCRO staff as the rainy and winter seasons are fast approaching.
3. EQUITABLE DISTRIBUTION OF WORK AS PER THE NORMS
The staff working in CCRO are burdened with heavy work load as the work of vacant posts ae distributed among the existing RO staff. The work distribution may be assigned as the norms and O&M of the CO/RO.
Consequent on transfer of the official the TCA post is kept vacant and additional burden of work to the existing staff. The TCA post is to be restored for normal functioning and to avoid accumulation of work.
2. ISTALATION OF REVERSE OSMOSIS (RO) WATER PURIFIER SYSTEM
CCRO staff are provided with can-water which should be of ISI standard. Pure drinking hot-water with an installation Reverse Osmosis System (ROS) in the Third Floor to cater to the needs of CCRO staff as the rainy and winter seasons are fast approaching.
3. EQUITABLE DISTRIBUTION OF WORK AS PER THE NORMS
The staff working in CCRO are burdened with heavy work load as the work of vacant posts ae distributed among the existing RO staff. The work distribution may be assigned as the norms and O&M of the CO/RO.
No comments:
Post a Comment